Progress is being made on Prabhupada’s Bridge which connects the back of the TOVP with the Long Building behind it. This bridge will provide easy access to the TOVP for Pujaris and other devotees directly serving the TOVP.
Jagadananda Prabhu has just completed aligning the cast iron fence on Prabhupada’s Bridge. Now that that’s completed, we will commence the detailing work for the pillar posts to prepare them for cladding, and of course go on with doing the final touches such as painting the cast iron itself. When you stand in front of the railing it looks absolutely stunning, as you have a beautiful frontal view of the peacocks.
Visit us at: www.tovp.org
Follow us at: www.facebook.com/tovp.mayapur
Watch us at: www.youtube.com/user/tovpinfo
View us 360° at: www.tovp360.org
App at: https://m.tovp.org/app
News & Texts at: https://m.tovp.org/newstexts
RSS News Feed at: https://tovp.org/rss2/
Buy from us at: https://tovp.org/tovp-gift-store/
Support us at: https://tovp.org/donate/seva-opportunities/
The ISKCON guru, nearly 70, says his energy never came back after an illness this…
The poster the GBC shared on 5 November names the clothes it prefers for whoever…
Image: Akincana Gocara (AI-generated), from a photo of Srila Prabhupada published by Nandgram Dham GLOBAL…
An updated briefing note from the Mumbai side of the ISKCON Bengaluru dispute sets out…
A Facebook reel asks whether a clip of Bhakti Vikasa Swami and Basu Ghosh Das…
Image: Akincana Gocara (AI-generated) ONLINE — Mukunda Hari, a Sanskrit teacher, is opening an online…